UK DIY, from the inside

The work that gets covered up.

Clean 3D cutaways of what is really happening under the grass, behind the wall and inside the hole when you build a fence, a deck, panelling or shelves. Every depth, spacing and setting time comes from the manufacturer or the regulator, so you do the job once.

FENCE 1 OF 53:39

Latest: How to Install a Fence Post with Postcrete. Depth, hole size, gravel, level and the water-first Postcrete pour, shown in section.

Shown in section

The ground is sliced open so you can see the hole, the gravel and the pour, not a pair of hands blocking the view.

Every number sourced

Depths from the HSE, setting times from the datasheet, height limits from the planning rules. The sources are listed under every video.

A materials list for every job

A printable list and a calculator that works out quantities for your fence, not the one in the video.

Series

Start at the first post.

All videos
FENCE 1 OF 53:39

Building a garden fence

Five videos from the first post to the last panel. The spine of the channel.

COMING

Before you dig

What is under the grass, how deep, and why plans alone are never enough. Applies to fences, decking, paving and sheds.

COMING

Decking from the ground up

Footings, joists, boards and fixings, shown in section, with the spans and spacings from the timber suppliers' own tables.

COMING

Wall panelling and battening

Battens, boards and fixing into plasterboard and masonry. Winter work.

COMING

Shelving and alcoves

Brackets, floating shelves and alcove units. Short videos, high search.

COMING

Materials explained

One product per video: Postcrete, UC4 timber, gravel boards, screws against nails.

Materials lists

Work out what to buy before you go to the yard.

Tell the calculator how many posts you are setting and it gives you the quantities, with the source for each figure beside it. Print it and take it with you.

Open the fence post calculator
SETTING A FENCE POST
Timber posts, 100 x 100 mm, pressure treated to Use Class 4, 2.4 m long1 per post
Postcrete or similar post fixing mix, 20 kg bags2 bags per post
Gravel or hardcore, 10 to 20 mm7 litres per post
Timber off-cuts for bracing, about 1.2 m, plus screws2 per post